+ Village Street Reconstruction Project Update

Street Repair-Wide

 

 

 

 

 

Street Construction Update

Tuesday October 31, 2017

Construction Staging Areas – The construction staging and storage area will remain in the southbound lane of Bradford Pear Drive near Gate 4 for the duration of the Phase 2 project that will be completed in February 2018.  This area continues to create congestion, and drivers should proceed with caution.  The storage area on Waterford Drive will also remain in place.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks on Summitview Drive will be completed this week.  ADA ramps to streets and alleys from sidewalks on Summitview Drive will begin at a date to be determined.

Bradford Pear Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks on Bradford Pear Drive will begin this week.  ADA ramps to streets and alleys from sidewalks on Bradford Pear Drive will begin at a date to be determined.  A schedule will be provided when the Summitview Drive work is nearing completion.

Crosswood Lane –The replacement of sidewalks will begin after the completion of sidewalks on Bradford Pear Drive.  ADA ramps to streets and alleys from sidewalks will follow.  A schedule will be provided when the Bradford Pear Drive work is nearing completion.

Phase 2 – The next phase of the project is in progress.  This project is addressing numerous street repairs and drainage concerns throughout the Village.  The project is scheduled for completion in February 2018.

Work Zones – There will be work zones throughout the Village through February 2018.

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive, Bradford Pear Drive, and Crosswood Lane is being aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

Please call the HOA office at 972-401-4946 with any questions.

 

Saturday October 7, 2017

Street Joint Sealing – This work is now in progress beginning on Summitview Drive.  The process involves sawing and sealing of joints on new street surfaces and will be dusty and noisy.  It will require approximately one week to complete and will then move to Bradford Pear Drive and finally to Crosswood Lane.

Bradford Pear Drive – Street paving on Bradford Pear Drive is complete.  The street will be reopened by the end of next week.

Bradford Pear Drive Detour – The detour will be removed by the end of next week. 

Construction Staging Area – The construction staging and storage area will remain on the southbound lane of Bradford Pear Drive near Gate 4 for the duration of the Phase 2 project that will be completed in February 2018.  This area continues to create congestion, and drivers should proceed with caution.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Summitview Drive is now in progress and is ongoing.  This project will require several weeks to complete.

Bradford Pear Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Bradford Pear Drive will follow the completion of work on Summitview Drive and will be ongoing.  A schedule will be provided when the Summitview Drive work is nearing completion.

Crosswood Lane –The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Crosswood Lane will begin after the completion of work on Bradford Pear Drive.  A schedule will be provided when the Bradford Pear Drive work is nearing completion.

Phase 2 – The next phase of the project will begin at the end of October 2017.  This project will address numerous street repairs and drainage concerns throughout the Village.

Work Zones – There will be work zones throughout the Village through February 2018.

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive and Bradford Pear Drive are being aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, September 21, 2017

Bradford Pear Drive – There will be a concrete pour in the northbound lane between Crosswood Lane and Boxwood Drive between 7:00AM and 5:00 PM on Friday, September 22, 2017.

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north continues for the duration of the project (approximately one month) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive northbound is also now open. 

Construction Staging Area – A construction staging and storage area remains on the southbound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area creates congestion, and drivers should proceed with caution.

Bradford Pear Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Bradford Pear Drive will ongoing through early October.

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Bradford Pear Drive street project is scheduled to be completed by the end of September.  Project updates with future work locations and closures will be provided weekly.  Please call the HOA office at 972-401-4946 with any questions.

 

Monday September 4, 2017

Bradford Pear Drive – The southbound lane between Crosswood Lane and Boxwood Drive will be completed with a planned concrete pour on Friday.  Demolition on the northbound lane in this area will begin this week.

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north continues for the duration of the project (approximately one month) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive northbound is also now open. 

Construction Staging Area – A construction staging and storage area remains on the southbound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area creates congestion, and drivers should proceed with caution.

Bradford Pear Drive Home Owners – Each home owner will be advised of the anticipated timing and expected duration of inconvenience at their respective properties.  Residents should contact the HOA office with any questions.

Golf Cart Access Ramp – The golf cart access ramp and pathway on Crosswood Lane is complete. This ramp connects Crosswood Lane to the Hackberry Creek Country Club cart path near the 10th green.  It is the only permissible access to the Club for golf carts registered with the Hackberry Creek HOA and housed in Hackberry Creek.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Summitview Drive is now in progress and will be ongoing. The contractor is currently preparing a schedule for this work.

Summitview Drive at Clearspring Drive North – This intersection is being reworked to remove the dips.  A concrete pour is scheduled for this week to complete this area.

Bradford Pear Drive Sidewalks and Street and Alley ADA Ramps – The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Bradford Pear Drive will follow the completion of work on Summitview Drive and will be ongoing. The contractor is currently preparing a schedule for this work.

Crosswood Lane – This roadway replacement is complete.  The replacement of sidewalks and ADA ramps to streets and alleys from sidewalks on Crosswood Lane will begin after the completion of work on Bradford Pear Drive. The contractor is currently preparing a schedule for this work.

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive is being aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

The Bradford Pear Drive project is scheduled to be completed by the end of September.  Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Saturday August 26, 2017

Bradford Pear Drive – A large segment was poured on Friday between Crosswood Lane and Boxwood Drive.  Demolition and site preparation continues on other segments.  These areas are scheduled to be poured next week, weather permitting. 

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north is in place for the duration of the project (approximately two months) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive is closed. 

Construction Staging Area – A construction staging and storage area has been established on the south bound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area will create congestion, and drivers should proceed with caution.

Bradford Pear Drive Home Owners – Each home owner will be advised of the anticipated timing and expected duration of inconvenience at their respective properties.  Residents should contact the HOA office with any questions.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of several driveway approaches and driveways, sidewalks and ADA ramps to streets and alleys from sidewalks on Summitview Drive are now in progress.

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Bradford Pear Drive project is scheduled to be completed by late September or early October, weather permitting. 

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Saturday August 5, 2017

Bradford Pear Drive – A large segment at the north end of the northbound lane beginning at Primrose Drive was poured on Friday.  Demolition and site preparation continues on the two other northbound segments.  These areas are scheduled to be poured next week weather permitting. 

Crosswood Lane – This roadway is nearing completion and is scheduled to open next week.  One additional small panel will be replaced.

Golf Cart Access Ramp – The golf cart access ramp and pathway on Crosswood Lane is complete. This ramp connects Crosswood Lane to the Hackberry Creek Country Club cart path near the 10th green.  The Club has been advised and will announce when it is open for use.  It is intended for usage by golf carts registered with the Hackberry Creek HOA and housed in Hackberry Creek.  Golf cart owners will soon be able to drive to the Hackberry Creek Country Club Clubhouse without driving on sidewalks and jumping curbs.

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north is in place for the duration of the project (approximately two months) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive is closed. 

Construction Staging Area – A construction staging and storage area has been established on the south bound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area will create congestion, and drivers should proceed with caution.

Bradford Pear Drive Home Owners – Each home owner will be advised of the anticipated timing and expected duration of inconvenience at their respective properties.  An extensive presentation provided by the HOA to explain the project was very poorly attended.  Residents should contact the HOA office with any questions.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of several driveway approaches and driveways, sidewalks and ADA ramps to streets and alleys from sidewalks on Summitview Drive are now in progress and will be ongoing for several weeks.

Summitview Drive at Clearspring Drive North

This intersection will be reworked to remove the dips.  Crosswalks  will be completed after the street work is finished.  Work is scheduled to begin in the next two weeks.  One side of the intersection will be closed at a time for the rework. 

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive is being aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

The Bradford Pear Drive project is scheduled to be completed in the middle of September.  Crosswood Lane is scheduled to be complete next week.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday July 27, 2017

Crosswood Lane – A major concrete pour will occur tomorrow (Friday, July 28th) on Crosswood Lane between Primrose Drive (McKee Park) and Clearspring South/North Drive.  This construction area will be closed to through traffic and there will be periodic total street closures between 8:00 AM and 5:00 PM.  The contractor will assist the few impacted residents living in the immediate construction area with passage to their homes. 

Bradford Pear Drive – The current detour route around Bradford Pear Drive will be impacted by the concrete pour at the intersections of Marigold Drive and Crosswood Lane and Primrose Drive and Crosswood Lane.  Please avoid this area if possible and expect significant delays during the day.

 

Saturday July 22, 2017

Bradford Pear Drive – A major concrete pour occurred on Friday at Bradford Pear Drive and Crosswood Lane.  Demolition and site preparation will begin on the northbound west side lane of Bradford Pear Drive near Primrose Drive.  

Crosswood Lane – Demolition and site preparation are under way on the east bound south side lane on Crosswood Lane.  A concrete pour is currently scheduled for Friday.  Please expect delays during the week.

Golf Cart Access Ramp – The golf cart access ramp and pathway on Crosswood Lane was poured today. This ramp connects Crosswood Lane to the Hackberry Creek Country Club cart path near the 10th green and is anticipated to open in approximately one week.  It is intended for usage by golf carts registered with the Hackberry Creek HOA and garaged in Hackberry Creek.  Golf cart owners will soon be able to drive to the Hackberry Creek Country Club Clubhouse without driving on sidewalks and jumping curbs.

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north is in place for the duration of the project (approximately two months) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive is closed. 

Construction Staging Area – A construction staging and storage area has been established on the south bound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area will create congestion, and drivers should proceed with caution.

Bradford Pear Drive Home Owners – Each home owner will be advised of the anticipated timing and expected duration of inconvenience at their respective properties.  An extensive presentation provided by the HOA on June 6th to explain the project was very poorly attended.  Residents should contact the HOA office at 972-401-4946 with any questions.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of several driveway approaches and driveways, sidewalks and ADA ramps to streets and alleys from sidewalks on Summitview Drive are now in progress and will be ongoing for several weeks. 

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive will be aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

The Bradford Pear Drive project is scheduled to be completed in the middle of September.  Crosswood Lane is scheduled to be completed by the end of July.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Friday July 21, 2017

Bradford Pear Drive – There will be a major concrete pour on Bradford Pear Drive near Crosswood Lane tomorrow, Friday, July 21st from 8:00 AM to 5:00 PM.  Residents should be aware that concrete trucks will be entering and leaving the area during most of the day.

Bradford Pear Drive is closed to through traffic from Boxwood Drive to Primrose Drive.  A detour around the construction zone using Boxwood Drive, Marigold Drive, Crosswood Lane and Primrose Drive is clearly marked by orange detour signs.  Local traffic only will be able to travel on portions of Bradford Pear Drive, but access will be restricted at times during the Friday concrete pour.

Summitview Drive – The contractor continues to have crews working on sidewalks, driveways, handicap ramps and cleanup on several areas of Summitview Drive.  There should be no disruption of traffic.

 

Saturday July 15, 2017

Bradford Pear Drive – Demolition and site preparation continue on the eastbound lane of Bradford Pear Drive near the intersection of Crosswood Lane.  A major concrete pour occurred on Bradford Pear Drive from Primrose Drive through Mulberry Way on Friday July 14.  A small pour was made today on Mulberry Way.

Next Week – A small concrete pour is scheduled for Wednesday on the alley between Primrose Drive and Mulberry Way.  A major concrete pour is scheduled for Friday on Bradford Pear Drive from Mulberry Way through Crosswood Lane.

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north is in place for the duration of the project (approximately two months) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive is closed. 

Construction Staging Area – A construction staging and storage area has been established on the south bound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area will create congestion, and drivers should proceed with caution.

Bradford Pear Drive Home Owners – Each home owner will be advised of the anticipated timing and expected duration of inconvenience at their respective properties.  An extensive presentation provided by the HOA to explain the project was very poorly attended.  Residents should contact the HOA office with any questions.

Summitview Drive Sidewalks and Street and Alley ADA Ramps – The replacement of several driveway approaches and driveways, sidewalks and ADA ramps to streets and alleys from sidewalks on Summitview Drive are now in progress and will be ongoing for several weeks. 

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive will be aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

The Bradford Pear Drive project is scheduled to be completed in the middle of September.  The completion of Crosswood Lane will follow unless it can be used as a filler project in the Bradford Pear Drive construction.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, July 13, 2017

Bradford Pear Drive – There will be a major concrete pour on Bradford Pear Drive near Primrose Drive tomorrow, Friday, July 14th from 7:00 AM to 4:00 PM.  Residents should be aware that concrete trucks will be entering and leaving the area during most of the day.  Bradford Pear Drive is closed to through traffic from Boxwood Drive to Primrose Drive.  A detour around the construction zone using Boxwood Drive, Marigold Drive, Crosswood Lane and Primrose Drive is clearly marked by orange detour signs.  Local traffic only will be able to travel on portions of Bradford Pear Drive, but access will be restricted at times during the Friday concrete pour.

Mulberry Way – There will be a small concrete pour on Mulberry Way on Saturday, July 15th.  Little or no traffic disruption is expected from this concrete pour.

Summitview Drive – The contractor continues to have crews working on sidewalks, driveways, handicap ramps and cleanup on several areas of Summitview Drive.  There should be no disruption of traffic.

 

Saturday, July 8, 2017

Bradford Pear Drive – Demolition and site preparation are under way from the northern end of Bradford Pear Drive at Primrose Drive through the intersection of Crosswood Lane.  A major concrete pour is currently scheduled for Friday July 14 weather permitting.  This event will close Bradford Pear Drive in the above areas for the majority of the day.

Bradford Pear Drive Detour – A permanent detour route from Boxwood Drive on the south to Primrose Drive on the north is in place for the duration of the project (approximately two months) around the construction zone on Bradford Pear Drive.  The detour route for Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive is closed. 

Construction Staging Area – A construction staging and storage area has been established on the south bound lane of Bradford Pear Drive near Gate 4 for the duration of the project.  This area will create congestion, and drivers should proceed with caution.

Bradford Pear Drive Home Owners – Each home owner will be advised of the anticipated timing and expected duration of inconvenience at their respective properties.  An extensive presentation provided by the HOA to explain the project was very poorly attended.  Residents should contact the HOA office with any questions.

Gate 2 Now Open– The work at Gate 2 was completed on schedule, and the gate opened on Saturday July 1.

Summitview Drive Street Replacement  Complete – All major street construction work on Summitview Drive is now complete. 

Summitview Drive Sidewalks and Street and Alley ADA Approach Ramps – The replacement of several driveway approaches and driveways, sidewalks and ADA approach ramps to streets and alleys from sidewalks on Summitview Drive is now in progress.  This project is scheduled to be completed by the end of July.

Special Notice:

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive will be aggressively monitored with the opening of all of the roadway and construction zones continuing at intersections, alleys, etc. 

The Bradford Pear Drive project is scheduled to be completed in the middle of September.  The completion of Crosswood Lane will follow unless it can be used as a filler project in the Bradford Pear Drive construction.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Friday, July 7, 2017

Summitview Drive – The contractor continues to have crews working on sidewalks, driveways, handicap ramps and cleanup on several areas of Summitview Drive.  There should be no disruption of traffic.

Bradford Pear Drive – Work is continuing on Bradford Pear Drive.  Bradford Pear Drive is closed to through traffic from Boxwood Drive to Primrose Drive.  A detour around the construction zone using Boxwood Drive, Marigold Drive, Crosswood Lane and Primrose Drive is clearly marked by orange detour signs.  Local traffic only will be able to travel on portions of Bradford Pear Drive during the street reconstruction project.  The first concrete pour on this street is scheduled for next Friday.

 

Saturday, July 1, 2017

Gate 2 – Laboratory strength tests on the most recent concrete pour test samples have indicated that the new concrete will be ready for traffic this weekend.  Therefore, Gate 2 (Regent Gate) reopened at 6:00 AM today (Saturday, July 1st).

Summitview Drive – The contractor plans to have crews working on sidewalks, driveways, handicap ramps and cleanup on Saturday (and perhaps Sunday afternoon) on several areas of Summitview Drive.  There should be no disruption of traffic.

Bradford Pear Drive – Demolition work is continuing on Bradford Pear Drive.  Bradford Pear Drive is closed to through traffic from Boxwood Drive to Primrose Drive.  A detour around the construction zone using Boxwood Drive, Marigold Drive, Crosswood Lane and Primrose Drive is clearly marked by orange detour signs.  Local traffic only will be able to travel on portions of Bradford Pear Drive during the street reconstruction project.  The first concrete pour on this street is scheduled for next Friday.

 

Saturday June 24, 2017

Bradford Pear Drive Construction Begins on Monday – Demolition is scheduled to begin on the northern end of Bradford Pear Drive on Monday morning, June 26, weather permitting.  The initial phase of this work on Bradford Pear Drive will include the area from Primrose Drive to Crosswood Lane.

Bradford Pear Drive Detour – Effective Monday, June 26, a permanent detour for the duration of the project around the construction zone on Bradford Pear Drive will begin.  This area will be closed to through traffic from Boxwood Drive on the south to Primrose Drive on the north.  The marked detour route around the closed area of Bradford Pear Drive will follow Boxwood Drive to Marigold Drive to Crosswood Lane to Primrose Drive to Bradford Pear Drive.  Crosswood Lane at Bradford Pear Drive will be closed to through traffic.  Detour signage will direct traffic.

Construction Staging Area – Effective Monday June 26, a construction staging and storage area will be established on the south bound side of Bradford Pear Drive near Gate 4.  Drivers should proceed with extra caution in this area.

Bradford Pear Drive Homeowners – An extensive presentation provided by the HOA on June 6 to explain the project to Bradford Pear Drive residents was very poorly attended.  The Homeowners Association has attempted to contact every affected resident on Bradford Pear Drive to give them the anticipated timing and expected duration of inconvenience at their respective properties and to identify any local issues.  If you are a Bradford Pear resident and have not yet responded to the Homeowners Association’s contact request, please call Rich Coady at 972-401-4946 as soon as possible.

Gate 2 Concrete Pour Complete – After two extensive concrete pours on Thursday and Friday, this phase is now complete.  We anticipate reopening Gate 2 as soon as the new concrete cures enough to reach the minimum required strength.

Rain Today – A planned Saturday work day will be extremely limited with the ongoing rain.  

Summitview Street Replacement Complete – All major street construction work on Summitview Drive is now complete.  All work areas are now open for traffic with the exception of the Gate 2 area.

Sidewalks and Street and Alley ADA Approach Ramps – The replacement of several driveway approaches and driveways, sidewalks and ADA approach ramps to streets and alleys from sidewalks on Summitview Drive is now in progress.  This project will require several weeks to complete.

Construction Advisory

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones may be reduced to one lane.
  • Construction zones have flashing lights or reflectors for driver safety.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Bradford Pear Drive
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

Radar Active – Please be advised that traffic on Summitview Drive will be aggressively monitored by radar with the opening of the majority of the roadway. 

Project Schedule – The Bradford Pear Drive project is scheduled to be completed in the middle of September followed by the completion of the Crosswood Lane project soon afterward.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday June 22, 2017

Scheduled Work

Friday, June 23rd – The first half of the major concrete pour on the north end of Summitview Drive near Gate 2 was successfully completed today.  The second half of the pour will start very early on tomorrow (Friday) morning and should be completed before the end of the day.  Because of the size of the concrete pumping station being used in the pour, it will be necessary to set up the pumper on Waterford Drive.  Concrete trucks will be entering and exiting the Village through Gate 1 every twenty minutes and will be travelling on Summitview Drive to Briarcrest Drive to Waterford Drive.  Summitview Drive (south of the construction zone), Pistachio Drive, Briarcrest Drive and Waterford Drive will all remain open at all times.  However, residents should use extra caution when driving on these streets or near the construction area.

Saturday, June 24th – The contractor plans to have crews working on sidewalks, driveways and handicap ramps on Saturday on several areas of Summitview Drive.  There should be no disruption of traffic.

Monday, June 26th – Demolition work is scheduled to begin on Bradford Pear Drive on Monday morning.  Bradford Pear Drive will be closed to through traffic from Boxwood Drive to Primrose Drive.  A detour around the construction zone using Boxwood Drive, Marigold Drive, Crosswood Lane and Primrose Drive will be clearly marked by orange detour signs.  Local traffic only will be able to travel on portions of Bradford Pear Drive during the street reconstruction project. 

The Homeowners Association has attempted to contact all residents on Bradford Pear Drive to give them additional information on the street reconstruction project and identify local issues.  If you are a Bradford Pear resident and have not yet responded to the Homeowners Association’s call, please contact Rich Coady at 972-401-4946 as soon as possible.

 

Wednesday June 21, 2017

There will be a major concrete pouring event on Summitview Drive near Gate 2 on Thursday and Friday of this week if the weather permits.   Due to the magnitude of this effort and the volume of concrete reserved in advance, work will begin between 4:30 and 5:00 AM and not conclude until around sunset on both days.

Thursday, June 22nd –  A concrete pumping station will be set up on Summitview Drive adjacent to and south of the Gate 2 construction zone.  This will require that the alley between Southern Oak Drive and Pistachio Drive be closed at Summitview Drive for the entire day.  Summitview Drive (south of the construction zone) and Pistachio Drive will remain open at all times.  However, concrete trucks are scheduled to be entering and exiting at Gate 1 and using Summitview Drive to reach the pour every twenty minutes during the day.  Residents should use extra caution when driving on Summitview Drive on Thursday.

Friday, June 23rd – A concrete pumping station will be set up near Gate 2 adjacent to and north of the construction zone.  All concrete delivery will be made through Gate 2.  No disruption on Village streets is anticipated.

This activity will be the last major disruption expected for the street replacement project on Summitview Drive.  We appreciate your cooperation and remind you to exercise extreme caution around construction equipment.

 

Thursday June 15, 2017

Summitview Drive – Summitview Drive between Huntersridge Drive and Clearspring Drive North will be closed to through traffic from 7:30 A.M. to 2:00 P.M. on Friday, June 16, 2017 for a concrete pour at Huntersridge Court.  The contractor will have personnel in the area to allow residents of Bridlewood Court and Huntersridge Court to pass through the construction zone to reach their homes. 

Detour – A detour will be designated around the concrete pour area from Clearspring Drive North to Ruston Lane to Huntersridge Drive.  Residents should expect minimal traffic delays.

Gate 2 (Regent Gate) – This gate remains closed for street replacement and residents should plan to use other gates as they enter or exit the Village.

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website.  However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information.  If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Monday June 12, 2017

Gate 2 Closed – To complete the replacement of the street near Gate 2 in the quickest and safest manner, the Homeowners Association closed this gate beginning on Friday June 2. It will be closed for approximately thirty days while the work is being done.  While it is recognized that the gate closure will inconvenience residents who normally use this gate, closing the gate will allow the contractor to complete this portion of the paving replacement project much faster and with greater resident safety and security than trying to route traffic through the construction area.

Additional failed panels in the outbound lane at Gate 2 have been added to the project to prevent another gate closure in the near future.  The demolition at Gate 2 is near completion, and we remain on schedule despite the recent rain.

Ongoing Street Replacement – Major street construction work is ongoing on Summitview Drive.  A concrete pour was canceled on Friday due to rain. This concrete pour has been rescheduled to tomorrow, Tuesday at the alley near Creekside Circle South on Summitview Drive, at Bridlewood Court and Summitview Drive, and on Summitview Drive near Blue Sage Court.  The final piece of Huntersridge Court and Summitview Drive is scheduled to be poured on Friday.  Crosswood Lane remains open for two way traffic.  Please be prepared for short delays in these construction areas.  

Sidewalks and Street and Alley ADA Approach Ramps – The replacement of sidewalks and ADA approach ramps to streets and alleys from sidewalks began today on Summitview Drive southbound near Creekside Circle South.  This project will take approximately one month to complete.

  • Major concrete pours are currently scheduled for Fridays.
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones is reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive is now open with a look both ways sign. 
  • Hunters Ridge Drive at Summitview Drive is now open with a look both ways sign.
  • Clearspring Drive North at Summitview Drive is now open with a look both ways sign.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive or Crosswood Lane.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  The Crosswood Lane replacement work schedule will be completed during the Bradford Pear Drive project at a date to be determined.  Each impacted homeowner on Summitview Drive and connected streets and Crosswood Lane is being contacted for ongoing project coordination.  Bradford Pear Drive construction is scheduled to begin at the end of June.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday June 8, 2017

Summitview Drive – There will be three small concrete pours on Summitview Drive tomorrow (Friday June 9th).  It will not be necessary to close Summitview Drive for these pours.  However, traffic through the construction zone may be slowed. 

Gate 2 (Regent Gate) – This gate remains closed for street replacement and residents should plan to use other gates as they enter or exit the Village.

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website.  However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information.  If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Friday June 2, 2017

Gate 2 Closes Today – To complete the replacement of the street near Gate 2 in the quickest and safest manner, the Homeowners Association will close this gate beginning on Friday June 2 for approximately thirty days while the work is being done.  While it is recognized that the gate closure will inconvenience residents who normally use this gate, closing the gate will allow the contractor to complete this portion of the paving replacement project much quicker and with greater resident safety and security than trying to route traffic through the construction area.  Several factors were considered in making this decision:
   
1.    The pavement to be replaced comes flush to the island adjacent to the gate guard parking area.  With the necessary construction screening and equipment space requirements, one side of the road would be totally closed and blocked for a minimum of three weeks. 
2.    There is a significant erosion issue near our storm drain on the outbound lane that will require excavation and investigation.  It is expected that significant additional concrete replacement or drainage envelope repairs will be required.
3.    During the construction period, only one side of the gate could remain open.  The traffic would initially be limited to one way in through the gate southbound.  Southern Oak Drive would be closed.  No vehicles would be able to exit the Village through this gate for three weeks.
4.    When the northbound lane was under construction, the entry side of the gate would need to be closed and only the northbound exit lane would be open.  Despite directional signage, there was concern that some residents or visitors would attempt to enter the Village through the exit lane where we have no security camera control and are not set up for guard control, creating both a safety and security hazard.
5.    Breaking the work into two lanes would cause entry into Southern Oak Drive and Waterford Drive be closed for up to six weeks.
6.    By closing the gate and allowing our contractor to work on both sides of the street at one time, he has committed to complete this project in four weeks rather than the seven weeks needed if a lane must be kept open.
7.    Keeping one side of the gate open at a time would create confusion, a potential traffic hazard and compromise Village security, plus significantly increasing the total inconvenience time to our residents. 

Learning Experience – With the closure of Gate 2 and a segment of Summitview Drive at Clearspring Drive North for our concrete pour today, traffic from the Gate 2 Waterford area was temporarily forced to use Pistachio Drive to exit the Village.  We learned that a number of residents did not know how to cross the Village to get to Gates 3 and 4.  We quickly dispatched staff to provide maps and directions to assist them.  Please review the map in the back of your directory to see the routes to the other gates.  With Gate 2 closed, Summitview Drive and Pistachio Drive will provide access to Gates 1,3, and 4.

Ongoing Street Replacement – Major street construction work is ongoing on Summitview Drive.  A concrete pour occurred today at Summitview Drive southbound at Clearspring Drive North.  Work will continue on Saturday on Summitview Drive weather permitting. Crosswood Lane is open for two way traffic.  Demolition and site preparation will continue on the alley near Creekside Circle South on south bound Summitview Drive, at Huntersridge Court and south bound Summitview Drive, at Clearspring Drive North and southbound Summitview Drive, and on southbound Summitview Drive near Blue Sage Court.  Please plan to use alternate routes to avoid significant delays in these construction areas.  Concrete pours are anticipated for Friday of next week.  These pours will occur on the alley at southbound Summitview Drive near Creekside Circle South, on Summitview Drive southbound at Huntersridge Court North and on Summitview Drive southbound near Blue Sage Court.
Sidewalks and Street and Alley ADA Approach Ramps – The replacement of sidewalks and ADA approach ramps to streets and alleys from sidewalks will begin on Monday June 5.  This project will take approximately one month to complete.

•    Major concrete pours are currently scheduled for Fridays.
•    Please observe and follow all construction signage.
•    Please observe the posted construction zone speed limit of 10 MPH.
•    Traffic in work zones is reduced to one lane.
•    Construction zones have flashing lights for driver safety.
•    Creekside Circle South at Summitview Drive is now open with a look both ways sign.  
•    Hunters Ridge Drive at Summitview Drive is now open with a look both ways sign.
•    Clearspring Drive North at Summitview Drive is now open with a look both ways sign.
•    Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North have been removed.
•    Periodic total street closures will continue to occur on Summitview Drive for demolition, concrete pours, etc., over the next two weeks.
•    Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive or Crosswood Lane.
•    Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June. The Crosswood Lane replacement work schedule is being determined.  Each impacted homeowner on Summitview Drive and connected streets and Crosswood Lane is being contacted for ongoing project coordination.  Bradford Pear Drive construction is scheduled to begin at the end of June.
Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Friday, May 26, 2017

No Construction on Memorial Day – There will be no street construction on Sunday or Memorial Day.

Gate 2 Closure – To complete the replacement of the street near Gate 2 in the quickest and safest manner, the Homeowners Association will close this gate beginning on Friday June 2 for approximately thirty days while the work is being done.  While it is recognized that the gate closure will inconvenience residents who normally use this gate, closing the gate will allow the contractor to complete this portion of the paving replacement project much quicker and with greater resident safety and security than trying to route traffic through the construction area.  Several factors were considered in making this decision:

  

  1. The pavement to be replaced comes flush to the island adjacent to the gate guard parking area.  With the necessary construction screening and equipment space requirements, one side of the road would be totally closed and blocked for a minimum of three weeks. 
  2. There is a significant erosion issue near our storm drain on the outbound lane that will require excavation and investigation.  It is expected that significant additional concrete replacement or drainage envelope repairs will be required.
  3. During the construction period, only one side of the gate could remain open.  The traffic would initially be limited to one way in through the gate southbound.  Southern Oak Drive would be closed.  No vehicles would be able to exit the Village through this gate for three weeks.
  4. When the northbound lane was under construction, the entry side of the gate would need to be closed and only the northbound exit lane would be open.  Despite directional signage, there was concern that some residents or visitors would attempt to enter the Village through the exit lane where we have no security camera control and are not set up for guard control, creating both a safety and security hazard.
  5. Breaking the work into two lanes would cause entry into Southern Oak Drive and Waterford Drive be closed for up to six weeks.
  6. By closing the gate and allowing our contractor to work on both sides of the street at one time, he has committed to complete this project in four weeks rather than the seven weeks needed if a lane must be kept open.
  7. Keeping one side of the gate open at a time would create confusion, a potential traffic hazard and compromise Village security, plus significantly increasing the total inconvenience time to our residents. 

 

The HOA and contractor have prepared a sign for the entry to the gate house announcing the date and extent of this closure.  Signage is now posted at Waterford Drive and Summitview Drive, Briarcrest Drive and Summitview Drive, and Southern Oak Drive and Summitview Drive announcing this upcoming closure.  It is expected that these signs plus weekly (or more frequent) construction progress reports in the Hackberry Creek Newsflash will provide sufficient notice to everyone about the gate closure and construction project progress. 

Ongoing Street Replacement – Major street construction work is ongoing on Summitview Drive.  A concrete pour occurred on Summitview Drive today southbound at Huntersridge Court.  Driveway approaches were also poured.  Work will continue on Saturday on Summitview Drive weather permitting. Crosswood Lane is anticipated to reopen for two way traffic by early next week. Demolition and site preparation will continue on the alley near Creekside Circle South on south bound Summitview Drive, at Huntersridge Court and south bound Summitview Drive, at Clearspring Drive North and southbound Summitview Drive, and on southbound Summitview Drive near Blue Sage Court.    Please plan to use alternate routes to avoid significant delays in these construction areas.  Two concrete pours are anticipated for Wednesday and Friday of next week.  These pours will occur on the alley at southbound Summitview Drive near Creekside Circle South, on Summitview Drive southbound and Clearspring Drive North and on Summitview Drive southbound near Blue Sage Court.

Sidewalks and Street and Alley ADA Approach Ramps – The replacement of sidewalks and ADA approach ramps to streets and alleys from sidewalks will begin on Monday June 5.  This project will take approximately one month to complete.

  • Major concrete pours are currently scheduled for Fridays.
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones is reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive is now open with a look both ways sign. 
  • Hunters Ridge Drive at Summitview Drive is now open with a look both ways sign.
  • Clearspring Drive North at Summitview Drive is now open with a look both ways sign.
  • Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North have been removed.
  • Periodic total street closures will continue to occur on Summitview Drive for demolition, concrete pours, etc., over the next two weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive or Crosswood Lane.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  The Crosswood Lane replacement work schedule is being determined.  Each impacted homeowner on Summitview Drive and connected streets and Crosswood Lane is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, May 25, 2017

STREET CLOSING ALERT – SUMMITVIEW DRIVE WILL BE CLOSED TO THROUGH TRAFFIC TOMORROW (FRIDAY, MAY 26TH)

Summitview Drive between Creekside Circle North and Clearspring Drive North will be closed to through traffic tomorrow (Friday, May 26th) from 9:00 AM – 3:00 PM.  The closure is necessary to pour the new concrete street in this area, weather permitting.  

The contractor plans to work until 7:00 PM on Friday and between 8:00 AM and 4:00 PM on Saturday, weather permitting. 

 

BRADFORD PEAR DRIVE RECONSTRUCTION SCHEDULE – Work is expected to begin on Bradford Pear Drive in early July.  The Homeowners Association will hold several project information meetings for Bradford Pear residents and any other interested Hackberry Creek residents.

WHAT:          Informational meeting about Bradford Pear Drive reconstruction project

WHERE:       Hackberry Creek Country Club

WHEN:          7:00 PM on Tuesday, June 6, 2017

WHO:            Residents who live on Bradford Pear Drive plus any other interested Hackberry Creek residents.

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website.  However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information.  If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Friday May 19, 2017

GATE 2 CLOSURE – To complete the replacement of the street near Gate 2 in the quickest and safest manner, the Homeowners Association has decided to close this gate beginning on Friday June 2 for approximately thirty days while the work is being done.  While it is recognized that the gate closure will inconvenience residents who normally use this gate, closing the gate will allow the contractor to complete this portion of the paving replacement project much quicker and with greater resident safety and security than trying to route traffic through the construction area.  Several factors were considered in making this decision:

The pavement to be replaced comes flush to the island adjacent to the gate guard parking area.  With the necessary construction screening and equipment space requirements, one side of the road would be totally closed and blocked for a minimum of three weeks. 

  1. There is a significant erosion issue near our storm drain on the outbound lane that will require excavation and investigation.  It is expected that significant additional concrete replacement or drainage envelope repairs will be required.
  2. During the construction period, only one side of the gate could remain open.  The traffic would initially be limited to one way in through the gate southbound.  Southern Oak Drive would be closed.  No vehicles would be able to exit the Village through this gate for three weeks.
  3. When the northbound lane was under construction, the entry side of the gate would need to be closed and only the northbound exit lane would be open.  Despite directional signage, there was concern that some residents or visitors would attempt to enter the Village through the exit lane where we have no security camera control and are not set up for guard control, creating both a safety and security hazard.
  4. Breaking the work into two lanes would cause entry into Southern Oak Drive and Waterford Drive be closed for up to six weeks.
  5. By closing the gate and allowing our contractor to work on both sides of the street at one time, he has committed to complete this project in four weeks rather than the seven weeks needed if a lane must be kept open.
  6. Keeping one side of the gate open at a time would create confusion, a potential traffic hazard and compromise Village security, plus significantly increasing the total inconvenience time to our residents. 

 

The HOA and contractor are currently preparing a sign at the entry to the gate house announcing the date and extent of this closure.  They will also prepare signs to be posted at Waterford Drive and Summitview Drive, Briarcrest Drive and Summitview Drive, and Southern Oak Drive and Summitview Drive announcing this upcoming closure.  It is expected that these signs plus weekly (or more frequent) construction progress reports in the Hackberry Creek Newsflash will provide sufficient notice to everyone about the gate closure and construction project progress. 

Ongoing Street Replacement – Major street construction work is ongoing on Summitview Drive.  A major concrete pour occurred on Summitview Drive today southbound at the Gate 1 bridge and at Creekside Circle South.  Crosswood Lane is anticipated to reopen for two way traffic by the end of next week.  Work will continue on Saturday on Summitview Drive weather permitting.  The next concrete pour is scheduled for Friday May 26 on Summitview Drive with temporary road closures as required.  Demolition and site preparation will continue at Creekside Circle South and south bound Summitview Drive and Huntersridge Court and south bound Summitview Drive.  Demolition will also begin on southbound Summitview Drive at Clearspring Drive North.  Please plan to use alternate routes to avoid significant delays in these construction areas.

Emergency Vehicles – Last Thursday the contractor hit and broke a gas line that was not buried at the proper depth per available drawings and surveys in an alley near Creekside Circle South and Summitview Drive.  The immediate area was closed with the fire department on stand-by until the broken line was repaired and buried at the proper depth by the gas company.  There were no injuries or damage, and one resident was temporarily evacuated for safety.

  • Major concrete pours are currently scheduled for Fridays.
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones is reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive will be opened with a look both ways sign. 
  • Hunters Ridge Drive at Summitview Drive will be opened with a look both ways sign.
  • Clearspring Drive North at Summitview Drive is scheduled to reopen next week with a look both ways sign.
  • Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North will be removed.
  • Periodic total street closures will continue to occur on Summitview Drive for demolition, concrete pours, etc., over the next four weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive or Crosswood Lane.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  The Crosswood Lane replacement work schedule will be updated next week.  Each impacted homeowner on Summitview Drive and connected streets and Crosswood Lane is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday May 18, 2017

STREET CLOSING ALERT – SUMMITVIEW DRIVE WILL BE CLOSED TO THROUGH TRAFFIC TOMORROW (FRIDAY, MAY 19TH)

Gate 1 and the construction area at the south end of Summitview Drive (up to Clearspring Drive South) will be closed to through traffic tomorrow (Friday, May 19th) from 9:30 AM – 3:00 PM.  The closure is necessary to pour the new concrete street in this area, weather permitting.  There will be barricades and road closed signs on Summitview Drive and at Gate 1.  During the concrete pouring time period, Gate 1 will be limited to concrete delivery trucks only and the gate officer will direct residents and guests to another gate.

The contractor plans to work until 7:00 PM on Friday and between 8:00 AM and 4:00 PM on Saturday, weather permitting. 

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website.  However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information.  If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Friday May 12, 2017

Major street construction work is ongoing on Summitview Drive and Crosswood Lane.  A major concrete pour on Crosswood Lane occurred today.  One lane will be reopened at the end of the day to two way traffic as the new concrete cures. Work will continue on Saturday on Summitview Drive.  The next concrete pour is scheduled for Friday May 19 on Summitview Drive with temporary road closures as required.  Demolition will continue at Creekside Circle South and south bound Summitview Drive and then move to Huntersridge Court and south bound Summitview Drive.  Please plan to use alternate routes to avoid significant delays in these construction areas.

  • Major concrete pours are currently scheduled for Fridays.
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones is reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive will be reopened next week. 
  • Hunters Ridge Drive at Summitview Drive will be reopened by the end of next week.
  • Clearspring Drive North at Summitview Drive remains closed for northbound concrete curing.
  • Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North are indicated with directional signage.
  • Periodic total street closures will continue to occur on Summitview Drive for demolition, concrete pours, etc., over the next five weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive or Crosswood Lane.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  Crosswood Lane replacement work is scheduled to be completed by early June.  Each impacted homeowner on Summitview Drive and connected streets and Crosswood Lane is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, May 11, 2017

 

 

CROSSWOOD LANE – Crosswood Lane will be closed to regular traffic tomorrow (Friday, May 12th) from 8:00 AM – 5:00 PM. The closure is necessary to pour the new concrete street in this area. The concrete trucks will be entering the community tomorrow through Gate 4. There will be barricades and road closed signs on Crosswood. Residents should plan to use alternate routes. The contractor plans to work until 7:00 PM on Friday. There is no parking permitted on Crosswood Lane in or near the construction area.

SUMMITVIEW DRIVE & CROSSWOOD LANE – The contractor plans to work between 8:00 AM and 4:00 PM on Saturday (weather permitting).

Traffic in work zones continues to be reduced to one lane. Residents should be courteous and allow passage through the construction area on an alternating basis. As a reminder, the speed limit in all construction areas is 10 MPH. The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website. However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information. If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline. 

 

Friday May 5, 2017

Major street construction work is ongoing on Summitview Drive and Crosswood Lane. There will continue to be periodic traffic closures on Summitview Drive between the Royal Gate and Brookside Drive and on Crosswood Lane between Clearspring Drive South and Primrose Drive.  A major concrete pour at Summitview Drive and Clearspring Drive North is occurring today.   The next concrete pour is scheduled for Friday May 12 on Crosswood Lane with road closures as required.  Please plan to use alternate routes to avoid significant delays in these construction areas.

  • Major concrete pours are currently scheduled for Fridays.
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Residents should be courteous and allow passage through the construction area on an alternating basis.
  • Traffic in work zones is reduced to one lane.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive is closed for northbound side replacement. 
  • Hunters Ridge Drive at Summitview Drive is closed for northbound side replacement.
  • Clearspring Drive North at Summitview Drive is closed for northbound replacement.
  • Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North are indicated with directional signage.
  • Periodic total street closures will continue to occur on Summitview Drive for demolition, concrete pours, etc., over the next six weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive or Crosswood Lane.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  Crosswood Lane replacement work is scheduled to be completed by early June.  Each impacted homeowner on Summitview Drive and connected streets and Crosswood Lane is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, May 4, 2017

SUMMITVIEW DRIVE – The construction area between Brookside Drive to Creekside Circle South will be closed to regular traffic tomorrow (Friday, May 5th) from 9:00 AM – 5:00 PM.  The closure is necessary to pour the new concrete street in this area.  The concrete trucks will be entering the community tomorrow through Gate 2.  There will be barricades and road closed signs on Summitview Drive.  Residents should plan to use alternate routes.

The contractor plans to work until 7:00 PM on Friday and between 8:00 AM and 4:00 PM on Saturday (weather permitting) preparing the next area for another concrete pour next week.  The date and time of the pour will be announced in a Hackberry Creek Newsflash.

CROSSWOOD LANE – There is no parking permitted on Crosswood Lane in or near the construction area.

Traffic in work zones continues to be reduced to one lane.  Residents should be courteous and allow passage through the construction area on an alternating basis.  As a reminder, the speed limit in all construction areas is 10 MPH.

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website. However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information. If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Friday April 28, 2017

Major street construction work continues on Summitview Drive.  There will continue to be traffic closures on Summitview Drive at the Royal Gate and at Clearspring Drive North today as we pour concrete at Huntersridge Drive and Summitview Drive.  A major concrete pour at Summitview Drive and Clearspring Drive North is currently scheduled for Friday of next week.  These ongoing phases continue to create major traffic disruptions on Summitview Drive between our Royal Gate and Clearspring Drive North.  Demolition work on Crosswood Lane is scheduled to begin on Monday.  Please plan to use alternate routes to avoid significant delays in these construction areas.

  • Major concrete pours are currently scheduled for Fridays.
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones is reduced to one lane.
  • Residents should be courteous and allow passage through the construction area on an alternating basis.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive is closed for northbound side demolition and replacement.
  • Hunters Ridge Drive at Summitview Drive is closed for northbound side demolition and replacement.
  • Clearspring Drive North at Summitview Drive is closed for northbound side demolition and replacement.
  • Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North are indicated with directional signage.
  • Periodic total street closures will occur on Summitview Drive for demolition, concrete pours, etc., over the next several weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  Each impacted homeowner on Summitview Drive and connected streets is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, April 27, 2017

STREET CLOSING ALERT – GATE 1 (ROYAL GATE) AND PORTIONS OF SUMMITVIEW DRIVE WILL BE CLOSED TOMORROW

SUMMITVIEW DRIVE – Gate 1 and the construction area at the south end of Summitview Drive (up to Clearspring Drive North) will be closed to regular traffic tomorrow (Friday, April 28st) from 9:00 AM – 5:00 PM.  The closure is necessary to pour the new concrete street in this area.  There will be barricades and road closed signs on Summitview Drive and at Gate 1.  During the concrete pouring time period, Gate 1 will be limited to concrete delivery trucks only and the gate officer will direct residents and guests to another gate.  Residents should plan to use alternate routes.

The contractor plans to work until 7:00 PM on Friday and between 8:00 AM and 4:00 PM on Saturday (weather permitting) preparing the next area for another concrete pour next week.  The date and time of the pour will be announced in a Hackberry Creek Newsflash.

CROSSWOOD LANE – The contractor expects to begin demolition on portions of Crosswood Lane on next Monday.  Traffic in work zones will be reduced to one lane.  Residents should be courteous and allow passage through the construction area on an alternating basis.

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website.  However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information.  If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Friday April 21, 2017

Major street construction work continues on Summitview Drive.  There will continue to be traffic closures on Summitview Drive at the Royal Gate and at Clearspring Drive South today as we pour concrete at Creekside Circle South and Summitview Drive.  The initial phases are creating major traffic disruptions on Summitview Drive between our Royal Gate and Clearspring Drive North.  Please plan to use alternate routes to avoid significant delays.

  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in work zones is reduced to one lane.
  • Residents should be courteous and allow passage through the construction area on an alternating basis.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive is closed for northbound side demolition and replacement.
  • Hunters Ridge Drive at Summitview Drive is closed for northbound side demolition and replacement.
  • Clearspring Drive North at Summitview Drive is closed for northbound side demolition and replacement.
  • Detour routes to Summitview Drive via Ruston Drive to Clearspring Drive South and Creekside Circle North are indicated with directional signage.
  • Periodic total street closures will occur on Summitview Drive for demolition, concrete pours, etc., over the next several weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  Each impacted homeowner on Summitview Drive and connected streets is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

Thursday, April 20, 2017

STREET CLOSING ALERT – GATE 1 (ROYAL GATE) AND PORTIONS OF SUMMITVIEW DRIVE WILL BE CLOSED ON FRIDAY

Gate 1 and the construction area at the south end of Summitview Drive (up to Clearspring Drive South) will be closed to regular traffic on Friday, April 21st from 9:00 AM – 3:00 PM.  The closure is necessary to pour the new concrete street in this area.  There will be barricades and road closed signs on Summitview Drive and at Gate 1.  During the concrete pouring time period, Gate 1 will be limited to concrete delivery trucks only and the gate officer will direct residents and guests to another gate.

The contractor plans to work until 7:00 PM on Friday and between 8:00 AM and 4:00 PM on Saturday preparing the next area for another concrete pour next week.  The date and time of the pour will be announced in a Hackberry Creek Newsflash.

The Homeowners Association is posting a weekly status report on the repaving project on the Village Information tab on the Homeowners Association website.  However, any resident with a question or issue can call the Association office (972) 401-4946 during business hours to get additional information.  If a problem in the construction zone occurs after business hours, residents are advised to call the Homeowners Association office and press “9” to be connected to the after-hours common area emergency hotline.

 

Thursday, April 13, 2017

Gate 1 and the construction area at the south end on Summitview Drive (up to Huntersridge Drive/Court) will be closed to regular traffic tomorrow (April 14th) between 10:00 AM – 2:00 PM.  The closure is necessary to pour the new concrete street in this area.  There will be barricades and road closed signs on Summitview Drive and at Gate 1.  During the concrete pouring time period, Gate 1 will be limited to concrete delivery trucks only and the gate officer will direct residents and guests to another gate.

Weather permitting, the contractor expects to pour another section of Summitview Drive next week and another temporary road closing can be expected.  The exact time of the closing will be announced in a special Hackberry Creek Newsflash.

Saturday, April 8, 2017

Major street construction work began on Summitview Drive on Monday, April 3rd.  This initial phase is creating major traffic disruptions on Summitview Drive between our Royal Gate and Clearspring Drive South and between Creekside Circle North and Bridlewood Court.  Please plan to use alternate routes if possible to avoid significant delays.

  • Construction crews will be operating this Saturday, April 8th on Summitview Drive. 
  • Please observe and follow all construction signage.
  • Please observe the posted construction zone speed limit of 10 MPH.
  • Traffic in these work zones is reduced to one lane.
  • Residents should be courteous and allow passage through the construction area on an alternating basis.
  • Construction zones have flashing lights for driver safety.
  • Creekside Circle South at Summitview Drive is closed for northbound side demolition and replacement.
  • Hunters Ridge Drive at Summitview Drive is closed for northbound side demolition and replacement.
  • Detour routes to Summitview Drive via Ruston Drive are indicated with directional signage.
  • Periodic total street closures will occur on Summitview Drive for demolition, concrete pours, etc., over the next several weeks.
  • Construction zones are designated and barricaded with no street parking permitted on either side of the street on Summitview Drive.
  • Sidewalks adjacent to construction work zones are closed for safety, work staging, etc.

The Summitview Drive portion of the street replacement project is scheduled to be completed by the end of June.  Each impacted homeowner on Summitview Drive and connected streets is being contacted for ongoing project coordination.

Project updates with future work locations and closures will be provided weekly. Please call the HOA office at 972-401-4946 with any questions.

 

DANGER – Construction Zones can pose a serious safety hazard to drivers, pedestrians and work crews.  Residents are urged to drive slowly and carefully when in the construction area.